U.S.
Department of Energy - Presidential Permit
Originally
a Presidential Permit was granted to Bangor Hydro Electric
Company in 1996 authorizing construction, operation, maintenance
and connection of facilities for the transmission of electric
energy between the United States and Canada.
In
September of 2003, Bangor Hydro Electric Company submitted
a Presidential Permit Modification. The links below provide the Presidential Permit Application submitted to the Department of Energy.
The Department of Energy completed an
Environmental Impact Statement (EIS). Public and agency comments were received on a draft EIS, then the final was published in the fall. You can view the EIS at both the DOE and Argonne National Laboratory websites, or by clicking here (pdf format). Please see the DOE
website for specific details on the EIS and Presidential Permit
Application process.
Maine
Department of Environmental Protection- Site Location of
Development, Natural Resources Protection Act & Federal
401 Water Quality Certification
Bangor Hydro filed an
application with the DEP in May 2005, and the Department granted the permits on October 27, 2005.
MPUC -
Certificate of Public Convenience and Necessity
Bangor
Hydro Electric Company has received the Certificate of Public Convenience and Necessity from the MPUC. Much of the material filed in relation to the NRI proceeding (docket number 2004-771) can be found at the PUC website at: www.maine.gov/mpuc.
Municipal
Permits
Bangor Hydro Electric received local permits from nine municipalities.
Bangor Hydro Electric Company had all necessary permits
for the project in hand on January 20, 2006.
|